October

October
Mechanical Room, Elevator, and Stairwell on Lower Level
October
Tutorial and Computer Labs
October
Gymnasium east concrete block wall
October
The future Library
October
The Lower Level has been rocked and compacted.
October
The Lower Level has been rocked and is in the process of being compacted.
October
The Cafeteria, Commons and Stage areas.
October
Southwest corner of the Athletic Field and Running Track.
October
Forming the last portion of the foundation of the Lower Level.
October
The concrete slab floor is complete in the Lower Level.
October
The Cafeteria, Commons and Stage areas.
October
Looking West over the Lower Level.  All first Floor steel has been erected.
October
Looking South, the block at the Gymnasium continues.
October
Looking North over the Lower Level Steel.
October
Looking southeast at the Commons Area and Gymnasium South wall.
October
Looking south at the 1st Floor Steel Columns and Precast Hollowcore deck.
October
Looking east at the Lower Level foundations, 1st Floor steel columns and north wall of the Commons.
October
Looking north through the Gymnasium and the Commons beyond.