May

May
Looking from the Commons into the Gallery
May
Janitor Closet
May
Coffee Room insulation and rough-in completed.
May
Kiln Room.
May
EPDM roofing at the Commons has been completed.
May
Curbs are finished at the Running Track
May
Roofing at the Locker Area and Library is 95% complete.
May
Curbs and retaining walls being built at the west side of campus.
May
Locker Room CMU ledge where the Metal Lockers will be installed.
May
Lifting one of the Skylight panels.
May
Taping Drywall at in a Tutorial Hallway.
May
Taped Tutorial Room.
May
Front Entry arches.
May
Lazy River a.k.a. the Running Track. 
May
Locker Room bench supports installed.
May
Locker Room shower stall.
May
First Floor Classroom Corridor
May
Retaining wall at Stair #3 exit door.
May
Plaster lathe and scratch coat underway at the Second Floor.
May
Tutorial Corridor has received a prime paint coat.
May
Teachers Work Area is being drywalled.
May
Retaining wall at the Basketball Court
May
Back Entrance
May
Retaining walls and sidewalks are underway.
May
Athletic Field has been graded.
May
Ceiling grid and 1st finish coat of paint are in.
May
Gymnasium backboard supports are installed.
May
Gallery Skylight.
May
Work at the Athletic Field is underway.
May
Retaining walls and grading ongoing at the Basketball Court and Play Area.
May
Plaster work completed at the back of the skylight.
May
Stair exit door retaining walls and plaster work underway.
May
Plaster work near completion at the northwest elevation.
May
West elevation plaster work completed.
May
Gymnasium windows and doors are installed.
May
Parents Room
May
Girls Locker Room has been block-filled.
May
Library drywall underway.
May
Stage and Commons areas.
May
Main Entry with Copy Room above.
May
Administrative Corridor.
May
Lower Level bathroom tile work is underway.
May
Lower Level Tutorial Rooms, painted with ceiling grid being installed.
May
Stair 2
May
West Entry
May
Art Room cabinets being installed.
May
Teacher's Work Area
May
West side with Play Area retaining wall installed.
May
Looking south, plaster is being applied at the Second Floor exterior.
May
Entry brickwork is underway.