March

March
Roof Top Unit #2 being lifted and placed.
March
Roof Top Unit #2 being lifted and placed.
March
Roof Top Unit #2 in place.
March
Roof Top Unit #3 above the Commons.
March
Roof Top Unit #3 in place.
March
Block work at the Library.
March
Stair #3 steel installation is underway.
March
Storage Room at the north end of the Gymnasium.
March
Copy Room 225 above the Gallery.
March
Concrete being poured and finished in the Gallery Area.
March
The Gallery into Stairwell #1.
March
Roofing installation at the north portion of the Building.
March
The Gymnasium is prepped for the concrete slab pour.
March
Stair #2 at the Lower Level.
March
Duct and Steel Stud work at the west portion of the Second Floor.
March
EPDM Roofing is underway.
March
The Gymnasium concrete slab has been poured.
March
Looking south through the Locker Room area.
March
Plumbing and Electrical rough-in at the Servery.
March
Brick veneer is being installed at the west side of the Building.
March
Library roof trusses are installed.
March
Trusses and plumbing rough-in at the Locker Area
March
Looking east through the Gallery at the Main Entry
March
Trusses and metal decking at the Servery
March
Completed EPDM Roofing at the west side of the Main Building
March
EPDM roofing underway at the Gymnasium
March
Brick Veneer at the west side is nearing completion
March
Looking south at the completed sheathing, steel framing, wood gutterboards and shingled roof.