June

June
Mock-up of the tile layout for the Gallery
June
Stage & Commons drywall being finished.
June
Staking is completed at the Playground
June
Bathrooms at the First Floor being tiled.
June
Entry arches are nearing completion
June
Rolling Door at the Parents Room has been installed.
June
Lower Level Lobby.
June
Lower Level drinking fountain has been installed.
June
Plaster work continues at the Second Floor exterior.
June
Looking through the Gallery at the Main Entry
June
Tutorial Room magnetic white board installation in progress
June
Art Room Countertops, shelving and sink area.
June
Coffee Area
June
West side asphalt prep and fence post work.
June
Basketball court is ready for asphalt.
June
Field underdrainage installed.
June
Girls Locker Room
June
Library entrance casework is installed.
June
Lower Level Storage area corridor.
June
Tutorial Room
June
First Floor Classroom with magnetic whiteboards installed.
June
First Floor Bathroom tile work.
June
Bathroom countertops and sinks are installed.
June
Stage flooring and painting is underway.
June
Asphalt and markings completed at the northwest area near the playground.
June
Playground curb work is underway.
June
Fencing is being installed at the basketball court.
June
Concrete is being placed at the Main Entry.
June
Gymnasium painting is underway.
June
Gallery drywall taping and finishing is near completion.
June
Servery sinks and cabinets/countertops being installed.
June
Restroom fixtures have been installed.
June
First Floor Classroom corridor broadloom carpet has been installed.
June
Second Floor Transition Room closets.
June
Lower Level Stair 1 tile work.
June
Teachers Work Room.
June
Coffee area tile is installed.
June
Topsoil is being distributed.
June
Playground work is underway.
June
MODot and Main Entry areas are being paved.
June
Exterior Parking lights are being installed.
June
Wood panel installation at the Commons.
June
Painting at the Gallery.
June
First Floor Classroom corridor.
June
Lower Level doors and hardware are installed.
June
First Floor Administrative bathroom.
June
Wood frames and carpet at the Reception area.
June
Gymnasium joists, ductwork and basketball posts are being painted.
June
Artist tiles are being installed at Stair 1.
June
Second Floor Classroom corridor.
June
Second Floor Gallery area floor tile is complete.
June
Teachers work area is nearing completion.