First Floor East Corridor Steel Framing
|
First Floor West Corridor Steel Framing
|
Looking South at the Main Building
|
Brickwork at the northwest area.
|
West side of the Gymnasium and Commons Area.
|
Rock being laid in the Commons.
|
Lower Level Steel Framing, Ductwork and Sprinkler Pipe.
|
First Floor Mechanical Chase
|
Second Floor Ductwork
|
Birckwork at the north wall of the Gymnasium above the Commons
|
Roof Top Unit Curb.
|
Mansard Roof nail base and ice/water shield.
|
South wall of the Gymnasium
|
East side of the School
|