January

Page 1  |  Page 2
January
First Floor East Corridor Steel Framing
January
First Floor West Corridor Steel Framing
January
Looking South at the Main Building
January
Brickwork at the northwest area.
January
West side of the Gymnasium and Commons Area.
January
Rock being laid in the Commons.
January
Lower Level Steel Framing, Ductwork and Sprinkler Pipe.
January
First Floor Mechanical Chase
January
Second Floor Ductwork
January
Birckwork at the north wall of the Gymnasium above the Commons
January
Roof Top Unit Curb.
January
Mansard Roof nail base and ice/water shield.
January
South wall of the Gymnasium
January
East side of the School