February

February
Insulation board beneath the Mansard Roof trusses.
February
Main Entrance at the east.
February
Lower Level water piping and door frames.
February
Looking South at the Exterior Steel Stud, Sheathing and Roof installation.
Square
Looking South at the Exterior Steel Stud, Sheathing and Roof installation.
February
Completed brick at the north wall of the Gymnasium.
February
Lower Level electrical conduit installation.
February
Lower Level water and sprinkler piping.
February
First Floor east Corridor ductwork and sprinkler pipe.
February
Looking South the completed Sheathing and Plywood backing.  Shingle work is underway.
February
Second Floor west Steel Framing, Ductwork and Sprinkler Piping.
February
Second Floor east.
February
Gallery Area looking west.
February
East side shingles are partially complete.
February
Mock-up for future sign at the Gymnasium
February
Shingles are completed on the east side.
February
Northwest elevation sheathing, plywood, shingles and brickwork.
February
Commons stage area.
February
Electrical wire is being pulled in the Lower Level
February
Stocked roofing materials at the Gymnasium
February
Gymnasium roof top unit Curb.
February
Roofing work at the North end.
February
Track & Field
February
Looking south at the ongoing roofing and exterior plywood and sheathing.