Looking south at the 1st Floor, 2nd Floor Steel & Precast Planks.
|
Looking northeast at the South wall of the Gallery area.
|
Looking south through the Gymnasium.
|
Looking north through the Gymnasium.
|
Looking south at the 1st Floor, 2nd Floor Steel & Precast Planks.
|
Looking east through the Gallery & Commons areas.
|
Looking South upon the completed Precast Hollowcore Roof Deck.
|
Looking east at the completed Elevator Shaft block.
|
Looking South at the progress of the steel studs and exterior sheathing at the 1st Floor.
|
1st Floor studs and sheathing are in place.
|
1st Floor.
|
Paric Carpenter installing wood blocking at the window openings.
|
Gymnasium Epic Roof Decking in progess.
|