April

April
East side at the Gymnasium and Locker Area.
April
Library is ready for concrete slab pour.
April
View of west side of Gymnasium and Servery.
April
A retaining wall installed at the North.
April
Copper ridge cap at the Mansard Roof has been installed.
April
First Floor west corridor.
 April
Looking down on the Gallery
April
Mechanical shaft and plumbing pipe at the First Floor.
April
Computer Lab
April
Lower Level corridor at Tutorial Rooms.
April
Lower Level Electrical Room
April
Look south at the continuing brick veneer and window frame installation.
April
West Entrance
April
Dumpster enclosure under construction
April
Brick continues at the northeast portion of the building.
April
Brick veneer at the north end is complete.
April
Looking South, the brick veneer has been completed, while window frame and glass installation is ongoing.
April
First Floor west drywall is nearing completion.
April
First Floor restroom
April
First Floor east acoustical installation has been installed.
April
Second Floor window frame installation underway.
April
Glass has arrived and is being installed!
April
Plaster lathe and glass installation is underway.
April
Concrete curbs are ongoing throughout the site.
April
A view looking northwest at the Gym, Servery and west wing.
April
A view looking northeast at the Gym, Locker and Library areas.